Understanding Your Loan Costs
As a buyer, it makes sense that your number one question would be, "How much is this going to cost me?" You'll see many costs detailed in the Construction Contract between you and your builder, and then some more on the Loan Estimate that you receive from your lender. It's important that you understand what all those numbers represent.
What Are Soft Costs?
Soft costs include any and all costs that are the builder's responsibility. These are not part of the actual construction, but necessary for facilitating it, such as permit fees, engineering fees, architectural fees, inspection fees, construction financing costs, and construction interest.
What Are Hard Costs?
Hard costs are the tangible costs necessary for the actual construction of the home, which includes all materials and labor costs.
Allowances
Funds included in the construction budget, called allowances, are allocated for anything that will be added to the house in the future. This can include flooring, fixtures, and cabinetry.
Contingency Reserve
Some Lenders may add a contingency reserve to the builder's total, usually around 10 percent. Other lenders leave it up to the builder and borrower to determine an agreeable amount for contingency to be included in the Construction Contract. This is meant as padding in the budget in the case of unforeseen costs or upgrades that might come up during construction. Any unused portion of this contingency becomes a principal reduction to the borrower's permanent loan when construction is complete.
Closing Costs
The amount you pay in closing costs may vary according to the lender. These can include the usual fees that come with a mortgage, such as application fees, appraisal fees, and credit reports. Closing costs amount to approximately 2 to 5 percent of the purchase price, so it's a good thing you only have to pay them once with the Single Close Loan!
Interested Party Contributions
Many FHA and VA mortgage transactions can be structured to have Interested Party Contributions, sometimes referred to as Seller Concessions. Using these can allow the closing costs/prepaids to be financed into the loan. For example, on an FHA loan where a 3.5 percent down payment is required, assuming the appraisal supports the loan amount needed to cover the costs, the Construction Contract can be structured to include Contributions from the Builder for the borrower's closing costs/prepaids.
Structuring the loan in this manner allows the borrower to invest only 3.5 percent of the acquisition cost, otherwise, the borrower would have to invest that, plus their closing costs/prepaids. The seller can also contribute towards closing costs/prepaids, but the total contributions from all interested parties cannot exceed 6 percent of the acquisition cost on FHA loans.
Do you know what's on your credit report?
Learn what your score means.

February 17, 2022Comparatively speaking, buying an existing home is a faster process than building on your own land. But a VA construction mortgage gives you the ability to approve the design for your home, which makes the wait worth it for many borrowers. What do you need to know about this process?
February 9, 2022The FHA One-Time Close construction loan, the VA equivalent of it, USDA construction loans, and even conventional construction mortgages all have features that make them different than existing construction loans.
February 5, 2022There are VA, FHA, and even USDA One-Time Close loans, and whichever type you choose, you have the advantage of a government-backed mortgage with a lower down payment requirement (3.5% minimum) than non-government-backed mortgages.